The City of Melbourne Public Works and Utilities Department is closing the outside eastbound lane of Eau Gallie Boulevard/SR 518 between U.S. 1 and Water Street on Wednesday, April 1. The closure will happen from 2 a.m. to 5 a.m. to allow workers to connect a sewer pipe. Drivers should plan alternate routes during that time. Butch Burke at (321) 608-5172 can answer questions about the project. The work is part of ongoing infrastructure improvements in the area. Traffic will be redirected using methods outlined in FDOT Index 102-613 to keep vehicles moving. No other lanes on the road will be closed during the work. The project is expected to last only the one night. Residents near the work zone are being asked to be patient as crews complete the connection. The sewer upgrade is designed to prevent future backups in the system. Similar projects have been done in other parts of the city this year. Drivers should watch for flaggers and temporary signs near the work area. The city says the work is necessary to maintain aging infrastructure. Completion of the sewer connection will be inspected by city officials after the project ends. No delays are expected beyond the scheduled closure window.
Local
Lane Closure on Eau Gallie Boulevard Set for April 1
The City of Melbourne will close an eastbound lane of Eau Gallie Boulevard on April 1 for sewer pipe work.
Source: City of Melbourne, FL